{"id":1481,"date":"2026-09-21T14:54:58","date_gmt":"2026-09-21T06:54:58","guid":{"rendered":"https:\/\/zhujikaiyi.com\/pe-rt-ii-electrofusion-reducing-tee\/"},"modified":"2026-10-04T09:37:34","modified_gmt":"2026-10-04T01:37:34","slug":"pe-rt-ii-electrofusion-reducing-tee","status":"publish","type":"page","link":"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-reducing-tee\/","title":{"rendered":"PE-RT II Electrofusion Reducing Tee"},"content":{"rendered":"<div class=\"wp-block-columns pert-ii-page has-ast-global-color-4-background-color has-background is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n\n<div class=\"wp-block-column is-vertically-aligned-top fittings-sidebar has-background is-layout-flow wp-container-core-column-is-layout-724f1636 wp-block-column-is-layout-flow\" style=\"background-color:#f5f6f8;padding-top:16px;padding-right:16px;padding-bottom:16px;padding-left:16px;flex-basis:20%\">\n<h2 class=\"wp-block-heading\" style=\"font-size:16px\"><strong>PE-RT II FITTINGS<\/strong><\/h2>\n<p class=\"ppr-pressure-label wp-block-paragraph\"><strong>BUTT FUSION FITTINGS<\/strong><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-butt-fusion-reducing-coupler\/\">Reducing Coupler<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-butt-fusion-90-degree-elbow\/\">90\u00b0 Elbow<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-butt-fusion-45-degree-elbow\/\">45\u00b0 Elbow<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-butt-fusion-equal-tee\/\">Equal Tee<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-butt-fusion-reducing-tee\/\">Reducing Tee<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-butt-fusion-stub-end\/\">Stub End<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-butt-fusion-end-cap\/\">End Cap<\/a><\/p>\n<p class=\"ppr-pressure-label wp-block-paragraph\"><strong>ELECTROFUSION FITTINGS<\/strong><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-coupler\/\">Electrofusion Coupler<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-reducing-coupler\/\">Electrofusion Reducer<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-90-degree-elbow\/\">Electrofusion 90\u00b0 Elbow<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-45-degree-elbow\/\">Electrofusion 45\u00b0 Elbow<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-equal-tee\/\">Electrofusion Equal Tee<\/a><\/p>\n<p class=\"has-text-color has-background wp-block-paragraph\" style=\"color:#07152b;background-color:#ffcc00;padding-top:8px;padding-right:12px;padding-bottom:8px;padding-left:12px\"><strong>Electrofusion Reducing Tee<\/strong><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-stub-end\/\">Electrofusion Stub End<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-end-cap\/\">Electrofusion End Cap<\/a><\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-male-female-threaded-tee\/\">Electrofusion Male \/ Female Threaded Tee<\/a><\/p>\n<\/div>\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:80%\">\n<h1 class=\"wp-block-heading\">PE-RT II Electrofusion Reducing Tee<\/h1>\n<p class=\"wp-block-paragraph\">PE-RT II electrofusion reducing tee is designed to create a 90-degree branch connection where the branch diameter is smaller than the main run. The listed range includes SDR11 \/ PN16 and SDR17 \/ PN10 configurations for compatible PE-RT II piping systems.<\/p>\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1254\" height=\"1254\" src=\"https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-tee.png\" alt=\"PE-RT II electrofusion reducing tee\" class=\"wp-image-1480\" srcset=\"https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-tee.png 1254w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-tee-300x300.png 300w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-tee-1024x1024.png 1024w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-tee-150x150.png 150w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-tee-768x768.png 768w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-tee-12x12.png 12w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-tee-600x600.png 600w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-tee-100x100.png 100w\" sizes=\"auto, (max-width: 1254px) 100vw, 1254px\" \/><\/figure><\/div>\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Material:<\/strong> PE-RT II<\/p>\n<p class=\"wp-block-paragraph\"><strong>Jointing:<\/strong> Electrofusion welding<\/p>\n<p class=\"wp-block-paragraph\"><strong>Type:<\/strong> Electrofusion Reducing Tee<\/p>\n<p class=\"wp-block-paragraph\"><strong>Connection:<\/strong> Reducing 90\u00b0 branch<\/p>\n<p class=\"wp-block-paragraph\"><strong>Pressure Classes:<\/strong> SDR11 \/ PN16, SDR17 \/ PN10<\/p>\n<p class=\"wp-block-paragraph\"><strong>Available Configurations:<\/strong> 153<\/p>\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button\"><a class=\"wp-block-button__link has-text-color has-background wp-element-button\" href=\"mailto:sales@zhujikaiyi.com?subject=Inquiry%20-%20PE-RT%20II%20Electrofusion%20Reducing%20Tee\" style=\"color:#07152b;background-color:#ffcc00\">Request a Quote<\/a><\/div><\/div>\n<\/div>\n<\/div>\n\n<h2 class=\"wp-block-heading\">All Models &amp; Specifications<\/h2>\n<p class=\"wp-block-paragraph\">Available PE-RT II electrofusion reducing tee models are grouped by SDR \/ PN for faster size selection. Dimensions are shown as run \u00d7 branch \u00d7 run.<\/p>\n<h3 class=\"wp-block-heading\">SDR11 \/ PN16<\/h3>\n<figure class=\"wp-block-table is-style-stripes pert-spec-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Size (mm)<\/th><\/tr><\/thead><tbody>\n<tr><td>25 \u00d7 20 \u00d7 25<\/td><\/tr>\n<tr><td>32 \u00d7 20 \u00d7 32<\/td><\/tr>\n<tr><td>32 \u00d7 25 \u00d7 32<\/td><\/tr>\n<tr><td>40 \u00d7 20 \u00d7 40<\/td><\/tr>\n<tr><td>40 \u00d7 25 \u00d7 40<\/td><\/tr>\n<tr><td>40 \u00d7 32 \u00d7 40<\/td><\/tr>\n<tr><td>50 \u00d7 20 \u00d7 50<\/td><\/tr>\n<tr><td>50 \u00d7 25 \u00d7 50<\/td><\/tr>\n<tr><td>50 \u00d7 32 \u00d7 50<\/td><\/tr>\n<tr><td>50 \u00d7 40 \u00d7 50<\/td><\/tr>\n<tr><td>63 \u00d7 20 \u00d7 63<\/td><\/tr>\n<tr><td>63 \u00d7 25 \u00d7 63<\/td><\/tr>\n<tr><td>63 \u00d7 32 \u00d7 63<\/td><\/tr>\n<tr><td>63 \u00d7 40 \u00d7 63<\/td><\/tr>\n<tr><td>63 \u00d7 50 \u00d7 63<\/td><\/tr>\n<tr><td>75 \u00d7 25 \u00d7 75<\/td><\/tr>\n<tr><td>75 \u00d7 32 \u00d7 75<\/td><\/tr>\n<tr><td>75 \u00d7 40 \u00d7 75<\/td><\/tr>\n<tr><td>75 \u00d7 50 \u00d7 75<\/td><\/tr>\n<tr><td>75 \u00d7 63 \u00d7 75<\/td><\/tr>\n<tr><td>90 \u00d7 25 \u00d7 90<\/td><\/tr>\n<tr><td>90 \u00d7 32 \u00d7 90<\/td><\/tr>\n<tr><td>90 \u00d7 40 \u00d7 90<\/td><\/tr>\n<tr><td>90 \u00d7 50 \u00d7 90<\/td><\/tr>\n<tr><td>90 \u00d7 63 \u00d7 90<\/td><\/tr>\n<tr><td>90 \u00d7 75 \u00d7 90<\/td><\/tr>\n<tr><td>110 \u00d7 32 \u00d7 110<\/td><\/tr>\n<tr><td>110 \u00d7 40 \u00d7 110<\/td><\/tr>\n<tr><td>110 \u00d7 50 \u00d7 110<\/td><\/tr>\n<tr><td>110 \u00d7 63 \u00d7 110<\/td><\/tr>\n<tr><td>110 \u00d7 75 \u00d7 110<\/td><\/tr>\n<tr><td>110 \u00d7 90 \u00d7 110<\/td><\/tr>\n<tr><td>125 \u00d7 32 \u00d7 125<\/td><\/tr>\n<tr><td>125 \u00d7 40 \u00d7 125<\/td><\/tr>\n<tr><td>125 \u00d7 50 \u00d7 125<\/td><\/tr>\n<tr><td>125 \u00d7 63 \u00d7 125<\/td><\/tr>\n<tr><td>125 \u00d7 75 \u00d7 125<\/td><\/tr>\n<tr><td>125 \u00d7 90 \u00d7 125<\/td><\/tr>\n<tr><td>125 \u00d7 110 \u00d7 125<\/td><\/tr>\n<tr><td>140 \u00d7 50 \u00d7 140<\/td><\/tr>\n<tr><td>140 \u00d7 63 \u00d7 140<\/td><\/tr>\n<tr><td>140 \u00d7 75 \u00d7 140<\/td><\/tr>\n<tr><td>140 \u00d7 90 \u00d7 140<\/td><\/tr>\n<tr><td>140 \u00d7 110 \u00d7 140<\/td><\/tr>\n<tr><td>140 \u00d7 125 \u00d7 140<\/td><\/tr>\n<tr><td>160 \u00d7 40 \u00d7 160<\/td><\/tr>\n<tr><td>160 \u00d7 50 \u00d7 160<\/td><\/tr>\n<tr><td>160 \u00d7 63 \u00d7 160<\/td><\/tr>\n<tr><td>160 \u00d7 75 \u00d7 160<\/td><\/tr>\n<tr><td>160 \u00d7 90 \u00d7 160<\/td><\/tr>\n<tr><td>160 \u00d7 110 \u00d7 160<\/td><\/tr>\n<tr><td>160 \u00d7 125 \u00d7 160<\/td><\/tr>\n<tr><td>160 \u00d7 140 \u00d7 160<\/td><\/tr>\n<tr><td>180 \u00d7 63 \u00d7 180<\/td><\/tr>\n<tr><td>180 \u00d7 75 \u00d7 180<\/td><\/tr>\n<tr><td>180 \u00d7 90 \u00d7 180<\/td><\/tr>\n<tr><td>180 \u00d7 110 \u00d7 180<\/td><\/tr>\n<tr><td>180 \u00d7 125 \u00d7 180<\/td><\/tr>\n<tr><td>180 \u00d7 140 \u00d7 180<\/td><\/tr>\n<tr><td>180 \u00d7 160 \u00d7 180<\/td><\/tr>\n<tr><td>200 \u00d7 50 \u00d7 200<\/td><\/tr>\n<tr><td>200 \u00d7 63 \u00d7 200<\/td><\/tr>\n<tr><td>200 \u00d7 75 \u00d7 200<\/td><\/tr>\n<tr><td>200 \u00d7 90 \u00d7 200<\/td><\/tr>\n<tr><td>200 \u00d7 110 \u00d7 200<\/td><\/tr>\n<tr><td>200 \u00d7 125 \u00d7 200<\/td><\/tr>\n<tr><td>200 \u00d7 140 \u00d7 200<\/td><\/tr>\n<tr><td>200 \u00d7 160 \u00d7 200<\/td><\/tr>\n<tr><td>200 \u00d7 180 \u00d7 200<\/td><\/tr>\n<tr><td>225 \u00d7 90 \u00d7 225<\/td><\/tr>\n<tr><td>225 \u00d7 110 \u00d7 225<\/td><\/tr>\n<tr><td>225 \u00d7 125 \u00d7 225<\/td><\/tr>\n<tr><td>225 \u00d7 140 \u00d7 225<\/td><\/tr>\n<tr><td>225 \u00d7 160 \u00d7 225<\/td><\/tr>\n<tr><td>225 \u00d7 180 \u00d7 225<\/td><\/tr>\n<tr><td>225 \u00d7 200 \u00d7 225<\/td><\/tr>\n<tr><td>250 \u00d7 75 \u00d7 250<\/td><\/tr>\n<tr><td>250 \u00d7 90 \u00d7 250<\/td><\/tr>\n<tr><td>250 \u00d7 110 \u00d7 250<\/td><\/tr>\n<tr><td>250 \u00d7 125 \u00d7 250<\/td><\/tr>\n<tr><td>250 \u00d7 160 \u00d7 250<\/td><\/tr>\n<tr><td>250 \u00d7 200 \u00d7 250<\/td><\/tr>\n<tr><td>250 \u00d7 225 \u00d7 250<\/td><\/tr>\n<tr><td>280 \u00d7 110 \u00d7 280<\/td><\/tr>\n<tr><td>280 \u00d7 125 \u00d7 280<\/td><\/tr>\n<tr><td>280 \u00d7 160 \u00d7 280<\/td><\/tr>\n<tr><td>280 \u00d7 200 \u00d7 280<\/td><\/tr>\n<tr><td>280 \u00d7 225 \u00d7 280<\/td><\/tr>\n<tr><td>280 \u00d7 250 \u00d7 280<\/td><\/tr>\n<tr><td>315 \u00d7 90 \u00d7 315<\/td><\/tr>\n<tr><td>315 \u00d7 110 \u00d7 315<\/td><\/tr>\n<tr><td>315 \u00d7 125 \u00d7 315<\/td><\/tr>\n<tr><td>315 \u00d7 160 \u00d7 315<\/td><\/tr>\n<tr><td>315 \u00d7 200 \u00d7 315<\/td><\/tr>\n<tr><td>315 \u00d7 225 \u00d7 315<\/td><\/tr>\n<tr><td>315 \u00d7 250 \u00d7 315<\/td><\/tr>\n<tr><td>355 \u00d7 110 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 125 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 160 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 200 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 225 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 250 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 315 \u00d7 355<\/td><\/tr>\n<tr><td>400 \u00d7 110 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 125 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 160 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 200 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 225 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 250 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 315 \u00d7 400<\/td><\/tr>\n<tr><td>500 \u00d7 110 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 160 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 200 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 250 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 315 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 400 \u00d7 500<\/td><\/tr>\n<tr><td>630 \u00d7 110 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 160 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 200 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 250 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 315 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 400 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 450 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 500 \u00d7 630<\/td><\/tr>\n<\/tbody><\/table><\/figure>\n<h3 class=\"wp-block-heading\">SDR17 \/ PN10<\/h3>\n<figure class=\"wp-block-table is-style-stripes pert-spec-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Size (mm)<\/th><\/tr><\/thead><tbody>\n<tr><td>355 \u00d7 110 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 160 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 200 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 250 \u00d7 355<\/td><\/tr>\n<tr><td>355 \u00d7 315 \u00d7 355<\/td><\/tr>\n<tr><td>400 \u00d7 110 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 160 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 200 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 250 \u00d7 400<\/td><\/tr>\n<tr><td>400 \u00d7 315 \u00d7 400<\/td><\/tr>\n<tr><td>450 \u00d7 110 \u00d7 450<\/td><\/tr>\n<tr><td>450 \u00d7 160 \u00d7 450<\/td><\/tr>\n<tr><td>450 \u00d7 200 \u00d7 450<\/td><\/tr>\n<tr><td>450 \u00d7 250 \u00d7 450<\/td><\/tr>\n<tr><td>450 \u00d7 315 \u00d7 450<\/td><\/tr>\n<tr><td>450 \u00d7 400 \u00d7 450<\/td><\/tr>\n<tr><td>500 \u00d7 110 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 160 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 200 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 250 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 315 \u00d7 500<\/td><\/tr>\n<tr><td>500 \u00d7 400 \u00d7 500<\/td><\/tr>\n<tr><td>630 \u00d7 110 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 160 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 200 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 250 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 315 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 400 \u00d7 630<\/td><\/tr>\n<tr><td>630 \u00d7 500 \u00d7 630<\/td><\/tr>\n<\/tbody><\/table><\/figure>\n\n<h2 class=\"wp-block-heading pert-product-intro-heading\">About PE-RT II Electrofusion Reducing Tee<\/h2>\n<p class=\"wp-block-paragraph\">PE-RT II electrofusion reducing tee is used to create a 90-degree branch where the branch size is smaller than the main run. It is commonly selected when a PE-RT II main pipeline needs to connect to a smaller secondary line while keeping all three connections electrofusion welded.<\/p>\n<p class=\"wp-block-paragraph\">The first and third dimensions represent the main run size, while the middle dimension represents the reduced branch size. For example, 160 \u00d7 110 \u00d7 160 mm means a 160 mm main run with a 110 mm branch. The fitting contains integrated electrofusion heating elements at its connection zones and should be selected to match the required pipe sizes and SDR \/ PN configuration.<\/p>\n\n<h2 class=\"wp-block-heading pert-material-heading\">About PE-RT II Material<\/h2>\n<p class=\"wp-block-paragraph\">PE-RT II (Polyethylene of Raised Temperature Resistance Type II) is a thermoplastic polyethylene material developed for piping systems that must maintain mechanical strength at elevated temperatures. Compared with conventional polyethylene, PE-RT II offers improved long-term temperature resistance while retaining the benefits of a weldable plastic piping system.<\/p>\n<p class=\"wp-block-paragraph\">Because PE-RT II remains thermoplastic, compatible pipes and fittings can be joined by butt fusion or electrofusion to create a continuous all-plastic welded pipeline system. The material is also valued for corrosion resistance, resistance to internal scaling, relatively low weight, smooth internal surfaces and installation flexibility.<\/p>\n<h3 class=\"wp-block-heading\">Operating Temperature<\/h3>\n<p class=\"wp-block-paragraph\">PE-RT II is used in hot- and cold-water and heating applications where elevated-temperature performance is required. The exact allowable temperature depends on pipe and fitting design, SDR or wall thickness, operating pressure and application class. Many PE-RT II piping systems are designed for long-term service in approximately the 70\u201380\u00b0C range, while short-term or maximum design conditions can reach about 95\u00b0C. Final temperature and pressure limits should always be confirmed against the actual pipe specification and project design conditions.<\/p>\n<h3 class=\"wp-block-heading\">Typical Applications<\/h3>\n<ul class=\"wp-block-list\"><li>Secondary district-heating and heat-distribution networks<\/li><li>Building heating and hot-water circulation systems<\/li><li>Radiant heating and underfloor heating systems<\/li><li>HVAC hydronic heating and cooling circuits<\/li><li>Heat-pump and geothermal circulation systems<\/li><li>Compatible industrial hot-water and thermal-fluid pipelines<\/li><\/ul>\n<h3 class=\"wp-block-heading\">Selection Considerations<\/h3>\n<p class=\"wp-block-paragraph\">For project selection, confirm pipe outside diameter, branch diameter, SDR or wall thickness, design pressure, normal operating temperature, maximum temperature, fluid medium and installation method together. This is especially important for heating networks because allowable pressure changes with operating temperature and intended service life.<\/p>\n\n<h2 class=\"wp-block-heading\">Product Details<\/h2>\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><h3 class=\"wp-block-heading\">Overview<\/h3><p class=\"wp-block-paragraph\">The PE-RT II electrofusion reducing tee combines branching and size reduction in one fitting. It allows a smaller branch line to be taken from a larger main while keeping the main run the same diameter on both sides.<\/p><\/div>\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><h3 class=\"wp-block-heading\">Product Features<\/h3><ul class=\"wp-block-list\"><li>PE-RT II construction<\/li><li>Electrofusion jointing<\/li><li>Reduced 90-degree branch<\/li><li>Main run remains the same diameter<\/li><li>Wide range of branch combinations<\/li><li>SDR11 \/ PN16 and SDR17 \/ PN10 options as listed<\/li><\/ul><\/div>\n<\/div>\n\n<h2 class=\"wp-block-heading\">Applications &amp; Installation<\/h2>\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><h3 class=\"wp-block-heading\">Typical Applications<\/h3><p class=\"wp-block-paragraph\">Used where compatible PE-RT II heating distribution, hot-water circulation, HVAC hydronic, heat-pump, geothermal or other thermal-fluid mains need to feed a smaller branch line.<\/p><\/div>\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><h3 class=\"wp-block-heading\">Electrofusion Jointing<\/h3><p class=\"wp-block-paragraph\">Prepare and clean all three pipe ends, scrape the fusion areas as required, align and clamp the components, then carry out electrofusion using compatible welding equipment and the applicable project installation procedure. Allow the joint to cool before removing clamps or applying load.<\/p><\/div>\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><h3 class=\"wp-block-heading\">Ordering Information<\/h3><ul class=\"wp-block-list\"><li>Main run \u00d7 branch \u00d7 main run size<\/li><li>Required SDR \/ PN<\/li><li>Quantity for each configuration<\/li><li>Project operating conditions if required<\/li><li>Delivery destination<\/li><\/ul><\/div>\n<\/div>\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n<h3 class=\"wp-block-heading\">How is the reducing tee size specified?<\/h3>\n<p class=\"wp-block-paragraph\">The dimensions are shown as main run \u00d7 branch \u00d7 main run. For example, 200 \u00d7 110 \u00d7 200 mm has a 200 mm run and a 110 mm branch.<\/p>\n<h3 class=\"wp-block-heading\">Which pressure classes are listed?<\/h3>\n<p class=\"wp-block-paragraph\">The supplied model list includes SDR11 \/ PN16 and SDR17 \/ PN10 configurations. Availability varies by size.<\/p>\n<h3 class=\"wp-block-heading\">What information is needed for quotation?<\/h3>\n<p class=\"wp-block-paragraph\">Please send the required size combination, SDR \/ PN class, quantity and delivery destination so we can confirm availability, pricing and lead time.<\/p>\n\n\n<div class=\"wp-block-group has-border-color has-white-background-color has-background is-layout-constrained wp-container-core-group-is-layout-b62443b2 wp-block-group-is-layout-constrained\" style=\"border-color:#ffcc00;border-width:1px;padding-top:20px;padding-right:20px;padding-bottom:20px;padding-left:20px\">\n<h2 class=\"wp-block-heading\">International Buyer &amp; Sourcing Information<\/h2><p class=\"wp-block-paragraph\">PE-RT II electrofusion reducing tees are suitable for branch connections between different PE-RT II pipe sizes. They are relevant to heating-system distributors, plumbing wholesalers and plastic-pipe importers. For bulk sourcing, provide the main size, branch size, quantity and destination market.<\/p><p class=\"wp-block-paragraph\"><strong>Need PE-RT II electrofusion reducing tees?<\/strong><\/p>\n<p class=\"wp-block-paragraph\">Send us your required main and branch sizes, SDR \/ PN class and quantities for quotation and lead-time confirmation.<\/p>\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button\"><a class=\"wp-block-button__link has-text-color has-background wp-element-button\" href=\"mailto:sales@zhujikaiyi.com?subject=Inquiry%20-%20PE-RT%20II%20Electrofusion%20Reducing%20Tee\" style=\"color:#07152b;background-color:#ffcc00\">Request a Quote \u2192<\/a><\/div><\/div>\n<\/div>\n\n<h2 class=\"wp-block-heading\">Related Products<\/h2>\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-border-color has-ast-global-color-4-background-color has-background is-layout-constrained wp-container-core-group-is-layout-088c155a wp-block-group-is-layout-constrained\" style=\"border-color:#dde3ea;border-width:1px;min-height:190px;padding:12px\"><div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\"><figure class=\"wp-block-image size-medium\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-equal-tee\/\"><img loading=\"lazy\" decoding=\"async\" width=\"1254\" height=\"1254\" src=\"https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-equal-tee.png\" alt=\"PE-RT II Electrofusion Equal Tee\" class=\"wp-image-1466\" srcset=\"https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-equal-tee.png 1254w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-equal-tee-300x300.png 300w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-equal-tee-1024x1024.png 1024w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-equal-tee-150x150.png 150w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-equal-tee-768x768.png 768w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-equal-tee-12x12.png 12w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-equal-tee-600x600.png 600w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-equal-tee-100x100.png 100w\" sizes=\"auto, (max-width: 1254px) 100vw, 1254px\" \/><\/a><\/figure><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\"><h3 class=\"wp-block-heading\" style=\"font-size:16px\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-equal-tee\/\">PE-RT II Electrofusion Equal Tee<\/a><\/h3><p class=\"wp-block-paragraph\">Equal electrofusion tee for 90-degree branch connections in PE-RT II systems.<\/p><\/div><\/div><\/div><\/div>\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-border-color has-ast-global-color-4-background-color has-background is-layout-constrained wp-container-core-group-is-layout-088c155a wp-block-group-is-layout-constrained\" style=\"border-color:#dde3ea;border-width:1px;min-height:190px;padding:12px\"><div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\"><figure class=\"wp-block-image size-medium\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-reducing-coupler\/\"><img loading=\"lazy\" decoding=\"async\" width=\"1254\" height=\"1254\" src=\"https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-coupler.png\" alt=\"PE-RT II Electrofusion Reducing Coupler\" class=\"wp-image-1430\" srcset=\"https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-coupler.png 1254w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-coupler-300x300.png 300w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-coupler-1024x1024.png 1024w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-coupler-150x150.png 150w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-coupler-768x768.png 768w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-coupler-12x12.png 12w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-coupler-600x600.png 600w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-reducing-coupler-100x100.png 100w\" sizes=\"auto, (max-width: 1254px) 100vw, 1254px\" \/><\/a><\/figure><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\"><h3 class=\"wp-block-heading\" style=\"font-size:16px\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-reducing-coupler\/\">PE-RT II Electrofusion Reducing Coupler<\/a><\/h3><p class=\"wp-block-paragraph\">Electrofusion reducer for straight transitions between different PE-RT II pipe sizes.<\/p><\/div><\/div><\/div><\/div>\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-border-color has-ast-global-color-4-background-color has-background is-layout-constrained wp-container-core-group-is-layout-088c155a wp-block-group-is-layout-constrained\" style=\"border-color:#dde3ea;border-width:1px;min-height:190px;padding:12px\"><div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\"><figure class=\"wp-block-image size-medium\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-stub-end\/\"><img loading=\"lazy\" decoding=\"async\" width=\"1254\" height=\"1254\" src=\"https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-stub-end.png\" alt=\"PE-RT II Electrofusion Stub End\" class=\"wp-image-1495\" srcset=\"https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-stub-end.png 1254w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-stub-end-300x300.png 300w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-stub-end-1024x1024.png 1024w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-stub-end-150x150.png 150w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-stub-end-768x768.png 768w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-stub-end-12x12.png 12w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-stub-end-600x600.png 600w, https:\/\/zhujikaiyi.com\/wp-content\/uploads\/2026\/09\/PERT-II-electrofusion-stub-end-100x100.png 100w\" sizes=\"auto, (max-width: 1254px) 100vw, 1254px\" \/><\/a><\/figure><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\"><h3 class=\"wp-block-heading\" style=\"font-size:16px\"><a href=\"https:\/\/zhujikaiyi.com\/ru_RU\/plastic-pipe-fittings\/pe-rt-ii-electrofusion-stub-end\/\">PE-RT II Electrofusion Stub End<\/a><\/h3><p class=\"wp-block-paragraph\">Electrofusion stub end for detachable flanged PE-RT II connections.<\/p><\/div><\/div><\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>PE-RT II FITTINGS BUTT FUSION FITTINGS Reducing Coupler 90\u00b0 Elbow 45\u00b0 Elbow Equal Tee Reducing Tee Stub End End Cap [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":165,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":"","_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","_yoast_wpseo_focuskw":"","rank_math_title":"PE-RT II Electrofusion Reducing Tee | KAIYI","rank_math_description":"Explore PE-RT II Electrofusion Reducing Tee from KAIYI for water, gas, drainage and industrial piping projects. Contact us for sizes, pressure ratings, techn...","rank_math_focus_keyword":"PE-RT II Electrofusion Reducing Tee"},"class_list":["post-1481","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/zhujikaiyi.com\/ru_RU\/wp-json\/wp\/v2\/pages\/1481","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zhujikaiyi.com\/ru_RU\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/zhujikaiyi.com\/ru_RU\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/zhujikaiyi.com\/ru_RU\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zhujikaiyi.com\/ru_RU\/wp-json\/wp\/v2\/comments?post=1481"}],"version-history":[{"count":6,"href":"https:\/\/zhujikaiyi.com\/ru_RU\/wp-json\/wp\/v2\/pages\/1481\/revisions"}],"predecessor-version":[{"id":1920,"href":"https:\/\/zhujikaiyi.com\/ru_RU\/wp-json\/wp\/v2\/pages\/1481\/revisions\/1920"}],"up":[{"embeddable":true,"href":"https:\/\/zhujikaiyi.com\/ru_RU\/wp-json\/wp\/v2\/pages\/165"}],"wp:attachment":[{"href":"https:\/\/zhujikaiyi.com\/ru_RU\/wp-json\/wp\/v2\/media?parent=1481"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}