HDPE Electrofusion Stub End
PE100 HDPE electrofusion stub end for creating flanged connections in water supply, irrigation and industrial PE piping systems. Available in SDR11 / PN16 and selected SDR17 / PN10 sizes from 50 mm to 1000 mm. Explore our Plastic Piping Systems for more PE piping products.

Material: PE100 HDPE
Jointing: Electrofusion welding
Pressure classes: SDR11 / PN16 & SDR17 / PN10
Size range: 50–1000 mm
Standards: ISO 4427-3 / EN 12201-3 / GB/T 13663
Welding data: Barcode / electronic welding data
Terminals: 4.0 mm / 4.7 mm
All Models & Specifications
Available electrofusion stub end sizes and pressure classes are listed below. Please specify the required diameter, pressure class and quantity when requesting a quotation.
| Model (mm) | Pressure Class |
|---|---|
| 50 | SDR11 PN16 |
| 63 | SDR11 PN16 |
| 75 | SDR11 PN16 |
| 90 | SDR11 PN16 |
| 110 | SDR11 PN16 |
| 125 | SDR11 PN16 |
| 140 | SDR11 PN16 |
| 160 | SDR11 PN16 |
| 180 | SDR11 PN16 |
| 200 | SDR11 PN16 |
| 225 | SDR11 PN16 |
| 250 | SDR11 PN16 |
| 280 | SDR11 PN16 |
| 315 | SDR11 PN16 |
| 355 | SDR11 PN16 |
| 400 | SDR11 PN16 |
| 450 | SDR11 PN16 |
| 500 | SDR11 PN16 |
| 630 | SDR11 PN16 |
| 710 | SDR11 PN16 |
| 800 | SDR11 PN16 |
| 900 | SDR11 PN16 |
| 1000 | SDR11 PN16 |
| 355 | SDR17 PN10 |
| 400 | SDR17 PN10 |
| 450 | SDR17 PN10 |
| 500 | SDR17 PN10 |
| 560 | SDR17 PN10 |
| 630 | SDR17 PN10 |
| 710 | SDR17 PN10 |
| 800 | SDR17 PN10 |
| 900 | SDR17 PN10 |
| 1000 | SDR17 PN10 |
Product Details
Overview
An electrofusion stub end provides a PE connection point for a flanged joint. It is commonly combined with a compatible backing ring or flange assembly when a removable connection to valves, equipment or another flanged pipeline section is required.
Product Features
- PE100 HDPE body
- Designed for flanged PE pipeline connections
- SDR11 / PN16 and selected SDR17 / PN10 sizes
- Barcode and electronic welding data supported
- Welding indicator for visual confirmation
- 4.0 mm and 4.7 mm terminal options
Applications & Installation
Typical Applications
Water supply networks, irrigation systems, industrial PE pipelines, pump and valve connections, water treatment installations and other PE piping systems requiring a detachable flanged connection.
Electrofusion Preparation
Cut the pipe square, scrape the oxidation layer over the complete insertion area, clean the prepared surface, align and clamp the fitting, then weld according to the barcode or specified welding data. Allow the joint to cool fully before assembling the flange connection or applying load.
Ordering Information
- Required outside diameter in mm
- Required SDR / PN class
- Quantity for each size
- Required flange or backing ring standard if applicable
- Delivery destination
Frequently Asked Questions
What is an electrofusion stub end used for?
It is used to create a flanged connection point on a PE pipeline, typically together with a compatible backing ring or flange assembly.
Are all sizes available in both SDR11 / PN16 and SDR17 / PN10?
No. SDR11 / PN16 covers the broader range, while SDR17 / PN10 is available only for the specific large-diameter sizes shown in the table.
What information should I provide for a quotation?
Please provide the required diameter, pressure class, quantity, flange standard if relevant and delivery destination so we can confirm availability, pricing and lead time.
Send us your stub end requirements
Get a quotation for HDPE electrofusion stub ends and related PE electrofusion fittings for your project.
Related Products
Electrofusion End Cap
PE100 end cap for permanently sealing PE pipeline ends.
Electrofusion Equal Tee
PE100 equal tee for same-diameter branch connections.
Electrofusion Coupler
PE100 coupling for straight PE pipe connections.


